Search
Now showing items 1-2 of 2
Studying the effect of server side constraints on the makespan of the no-wait flow shop problem with sequence dependent setup times.
(International Journal of Production Research, 2015)
This paper deals with the problem of scheduling the no-wait flow-shop system with sequence-dependent set-up times and server side-constraints. No-wait constraints state that there should be no waiting time between consecutive ...
A particle swarm optimisation for the no-wait flow shop problem with due date constraints.
(International Journal of Production Research, 2016)
This paper considers the no-wait flow shop scheduling problem with due date constraints. In the no-wait flow shop problem, waiting time is not allowed between successive operations of jobs. Moreover, a due date is associated ...