Search
Now showing items 1-2 of 2
Studying the impact of merged and divided storage policies on the profitability of a remanufacturing system with deteriorating revenues
(International Journal of Production Economics, 2017-11)
Merging capacity for a remanufacturing system is studied in this paper. In the system under study, there are two streams for returns and each stream has its dedicated processing line. However, the storage space is merged ...
On the exact solution of the no-wait flow shop problem with due date constraints
(Computers & Operations Research, 2017-05)
This paper deals with the no-wait flow shop scheduling problem with due date constraints. In the no-wait flow shop problem, waiting time is not allowed between successive operations of jobs. Moreover, the jobs should be ...