Repository logo
 

Institutional requirements for watershed cumulative effects assessment in the south Saskatchewan watershed

Date

2010-06

Journal Title

Journal ISSN

Volume Title

Publisher

ORCID

Type

Degree Level

Masters

Abstract

Watersheds in Canada are under increasing threats due to the cumulative environmental effects from natural and anthropogenic sources. Cumulative effect assessment (CEA), however, if done at all is typically done on a project-by-project basis. This project-based approach to CEA is not sufficient to address the cumulative effects of multiple stressors in a watershed or a region. As a result, there is now a general consensus that CEA must extend from the project to the more regional scale. The problem, however, is that while the science of how to do watershed CEA (W-CEA) is progressing, the appropriate institutional arrangements to sustain W-CEA have not been addressed. Based on a case study of the South Saskatchewan Watershed (SSW), this research is aimed to identify the institutional requirements necessary to support and sustain W-CEA. The research methods include document reviews and semi-structured interviews with regulators, administrators, watershed coordinators, practitioners, and academics knowledgeable on cumulative effect assessment and project-based environmental assessments (EAs). The findings from this research are presented thematically. First, participants’ perspectives on cumulative effects, the current state of CEA practice, and general challenges to project-based approaches to CEA are presented. The concept of WCEA is then examined, with a discussion on the need for linking project-based CEA and W-CEA. This is followed by the institutional requirements for W-CEA. The Chapter concludes with foreseeable challenges to implementing W-CEA, as identified by research participants. The key findings include that cumulative effect assessments under project-based EAs are rarely undertaken in the SSW, and the project-based EA approach is faced with considerable challenges. The project-based EA challenges suggested by interview participants are similar to the ones discussed in the literature, and are primarily related to the lack of guidance to proponents regarding boundaries of assessments and thresholds, the lack of data from other project EAs, and the lack of capacity of both proponents and regulators to achieve a good CEA under project EA. These challenges could be addressed by establishing regional objectives at a broader scale, which could provide better context to project-based approaches. Further, interview results revealed several opportunities for the government to take the lead in implementing and sustaining W-CEA, but a multistakeholder approach is essential to W-CEA success. The results also suggest that the establishments of thresholds and data management are necessary components of W-CEA, but that the need for legislation concerning such thresholds and W-CEA initiatives is not agreed upon. At the same time, research results emphasize that the coordination and education among various stakeholders will be difficult to achieve. The lack of financial commitment, political will, and difficulties in establishing cause-effect relationships currently impede the implementation of W-CEA.

Description

Keywords

South Saskatchewan watershed, Cumulative effects, Cumulative effects assessment, Institutional arrangements, Project-based assessments

Citation

Degree

Master of Environment and Sustainability (M.E.S.)

Department

School of Environment and Sustainability

Program

School of Environment and Sustainability

Citation

Part Of

item.page.relation.ispartofseries

DOI

item.page.identifier.pmid

item.page.identifier.pmcid