DESIGN, THERMAL SIMULATION AND ECONOMIC FEASIBILITY ANALYSIS OF A PLANT FACTORY HOUSED IN A UNDERGROUND MINE DRIFT
dc.contributor.advisor | Guo, Huiqing | |
dc.contributor.committeeMember | Zhang, Chris | |
dc.contributor.committeeMember | Tabil, Lope | |
dc.contributor.committeeMember | Liang, Xiaodong | |
dc.creator | Akram, Md. Washim | |
dc.creator.orcid | 0000-0003-4564-876X | |
dc.date.accessioned | 2023-02-07T17:39:42Z | |
dc.date.copyright | 2023 | |
dc.date.created | 2023-01 | |
dc.date.issued | 2023-02-07 | |
dc.date.submitted | January 2023 | |
dc.date.updated | 2023-02-07T17:39:44Z | |
dc.description.abstract | This item is under an embargo. Access to the abstract will not be permitted until 2026-02-07 | |
dc.format.mimetype | application/pdf | |
dc.identifier.uri | https://hdl.handle.net/10388/14473 | |
dc.language.iso | en | |
dc.subject | Underground plant factory | |
dc.subject | ANSYS Fluent | |
dc.subject | Thermal simulation | |
dc.subject | OpenStudio | |
dc.subject | Passive ventilation | |
dc.subject | Heat recovery | |
dc.subject | Energy savings | |
dc.subject | Economic feasibility | |
dc.title | DESIGN, THERMAL SIMULATION AND ECONOMIC FEASIBILITY ANALYSIS OF A PLANT FACTORY HOUSED IN A UNDERGROUND MINE DRIFT | |
dc.type | Thesis | |
dc.type.material | text | |
local.embargo.lift | 2026-02-07 | |
local.embargo.terms | 2026-02-07 | |
thesis.degree.department | Mechanical Engineering | |
thesis.degree.discipline | Mechanical Engineering | |
thesis.degree.grantor | University of Saskatchewan | |
thesis.degree.level | Masters | |
thesis.degree.name | Master of Science (M.Sc.) |
Files
License bundle
1 - 1 of 1